Sample of decoration contract for labor and materi

2022-07-22
  • Detail

Contracting labor and materials is the current all inclusive decoration. Most young people now choose all inclusive decoration. How much do you know about contracting labor and materials? Do you know the contract that needs to be signed before decoration? The following Xiaobian will bring you a sample of the decoration contract for labor and materials. You can choose it for reference! I hope it can help you

contracting labor and materials is now all inclusive decoration. Most young people now choose all inclusive decoration. How much do you know about contracting labor and materials? Do you know the contract that needs to be signed before decoration? The following Xiaobian will bring you a sample of the decoration contract for labor and materials. You can choose it for reference! I hope it can help you

sample of decoration contract for labor and materials

entrusting party (Party A): Address: ID number: Telephone:

undertaking party (Party B): Address: ID number: Telephone:

Project:

after friendly negotiation and negotiation, Party A and Party B decided to entrust Party B to decorate (decorate) the room. In order to ensure the smooth progress of the project, in accordance with relevant national laws and regulations, this contract is hereby signed for mutual compliance

Article 1: project overview

1 Project address:________________________________________________

2. Room specification:____ Room____ Hall____ Kitchen____ Wei, construction building area____ Square meters

3. Entrustment method: Labor and materials contracting (except for anti-theft doors, lamps and flooring materials)

4 Project price (amount in words):________________ The project price includes the project materials listed in Article 3 of the contract, all labor costs in the decoration process, removal fees, decoration waste cleaning fees, etc. (Note: all labor costs and engineering material costs related to decoration shall be borne by Party B. If Party B requests payment of other costs in the construction project, Party A has the right to refuse to pay. If Party B delays the construction on this ground, Party A has the right to terminate the contract and investigate the relevant liabilities for breach of contract.)

5. Commencement date:_______ Year_______ Month_______ Day

6 Project completion date:_______ Year_______ Month_______ Total project days per day:______ Article 2: construction content

1 Living room: one shoe cabinet, launch in the living room, plaster line, ceiling, plastic steel window, four sockets and two switches

2. Master bedroom: one wardrobe (with shuttle door) plus hanging cabinet, one balcony wardrobe (with shuttle door) plus hanging cabinet, two bedside cabinets, plaster line, six sockets and two switches

3. Second bedroom: a wardrobe (with shuttle door) plus a hanging cabinet, a partition between the main bedroom and the second bedroom, a new wall, a plastic steel floating window, a computer table with a bookcase, two bedside cabinets, gypsum lines, four sockets and two switches

4. Kitchen: water renovation, wall tiles, floor tiles, customized overall cabinets, smoke-free stove, exhaust fan installation, stone door installation, ceiling (aluminum gusset plate), vegetable basin installation, water mixing valve, cutting board quartz stone installation, six sockets and two switches installation, waterproof treatment

5. Toilet: Sewer reconstruction, wall tiles, floor tiles, ceiling (aluminum gusset plate), stone door installation, washstand and cabinet installation, basin mixing valve, washing machine faucet and interface, floor drain, sitting toilet (including water tank), installation of two sockets and two switches, waterproof treatment

6. Specific requirements for the installation of strong and weak current: all circuits (wires, cable TV, telephone, computer network cables) should go through pipes, and the wires should be grounded. The lines of strong current should not be connected underground, but should be connected into the distribution box (socket, Tianguan). The socket panel should use five eyes, the switch has five eye socket, and six groups of distribution boxes (air switches) should be installed

7. The process of wall construction: one primer and two finishing coats. The emulsion paint must be made into one base and two sides in strict accordance with the proportion of water added. Do not add more water. The wall treatment should be horizontal and vertical, and the internal and external corners should be straightened

8. Order the whole cabinet: Party B entrusts a special manufacturer to order the whole cabinet, and the standard is 750 yuan/straight meter. If the cost exceeds the standard, the extra part will be borne by Party A. Special provisions: the back of the overall cabinet must be covered with wall tiles, the countertop material is quartz stone, and the cabinet surface is Pu board

Article 3: Decoration Engineering Materials

serial number product name brand/specification price remarks

1 xx xx xx xx

2. xx xx xx xx

3. xx xx xx xx

4. xx xx xx xx

1. Party B shall clearly mark the price of the materials used in this contract, and they are qualified products produced by regular manufacturers. The materials provided by Party A shall be used in the interior decoration works specified in this contract and shall not be used for other purposes without the consent of Party A. If Party B misappropriates the materials for other purposes, it shall compensate Party A by double the price of the misappropriated materials

2. The materials and equipment provided by Party B shall not be used if they do not meet the quality requirements or have different specifications. If it has been used, Party B shall be responsible for the losses caused to the project

3. After the materials are accepted by Party B, Party B shall be responsible for keeping them, and Party B shall be responsible for making compensation for the losses caused by improper storage

4. The variety, specification and name of the main materials used by Party B in the project shall be approved by Party A

5. The project price includes the cost of materials. If Party A purchases materials by itself, the cost shall be deducted from the total amount

Article 5: payment method

commencement payment______ Yuan, paid after the completion and acceptance of hydropower______ Yuan, paid after the completion and acceptance of masonry, wall paint and paint______ Yuan, paid after the house is delivered and accepted______ Yuan, the balance will be paid after the house is handed over

Article 6: other matters

1 Safety issues: Party B shall strictly follow the safe construction, and Party B shall be responsible for any safety accident

2. This contract is made in duplicate, with each party holding one copy. Both parties shall take effect from the date of signing

Party A (owner): Party B (Contractor):

signing date: signing date:

the above is the sample of the decoration contract of labor and materials contracted by Xiaobian. You can refer to the above for contract drafting. I hope it can help you. It is very important to sign the contract on decoration. Many details need to be made clear in the contract to avoid some problems in the future